This is an actual inspection report format — property details changed, findings representative. What you receive looks exactly like this.

Parakh

Inspection Report

Standard Plan · 75-point inspection

Report #BT-2024-0847

Inspected: 14 Nov 2024

Delivered: 14 Nov 2024, 11:42 PM

Property

2BHK, 3rd floor

Location

Sector 49, Gurgaon

Built-up area

~1,100 sqft

Inspector

Ramesh P.

Executive Summary

2

High Priority

2

Medium Priority

1

Low / Info

Overall assessment: Property has 2 high-priority issues that should be resolved before signing or factored into negotiation. Structural condition is adequate. Recommend conditional move-in only after addressing high-priority electrical and seepage findings.

Detailed Findings

High

Master Bedroom

Active seepage behind wardrobe, NW wall

Moisture meter reading: 78% (threshold: 25%). Hidden behind freshly painted surface. Likely source: external waterproofing failure or terrace drainage issue above.

Recommendation:Pre-move-in repair essential. Negotiate reduction or written commitment to fix within 30 days.

📷 Moisture meter reading 78% on bedroom wall, annotated photo

High

Kitchen

Faulty earthing — socket near sink

Socket tester confirmed incorrect earthing on kitchen socket adjacent to sink. Water proximity makes this a direct shock hazard.

Recommendation:Request immediate electrician fix before signing. Non-negotiable safety item.

📷 Socket tester showing earthing fault, kitchen

Medium

Bathroom 2

Drainage slow — potential partial blockage

Drain cleared in 4.2 minutes (standard: <2 min). Likely partial blockage in the P-trap. Functional but will worsen.

Recommendation:Request plumber visit before move-in. Low cost to fix (₹500-800).

📷 Drain timer documentation, bathroom 2

Medium

Living Room

Hairline cracks — 3 locations, E wall

Three hairline cracks noted, 20-35cm length each. Current assessment: cosmetic/settling, not structural. Monitor if worsening.

Recommendation:Document with photos. Not a deal-breaker but should be noted in the lease agreement.

📷 Crack documentation, living room east wall

Low

All Rooms

General electrical — 9/11 sockets pass

9 of 11 sockets tested pass earthing and polarity check. 2 sockets (bedroom 2, main hall) excluded from finding above.

Recommendation:No action needed for the 9 passing sockets.

📷 Socket testing log, all rooms

Negotiation Talking Points

Use these when talking to the landlord. They're framed as reasonable asks, not demands.

Must-have

Active seepage, master bedroom

Repair before move-in OR ₹5,000-8,000 deposit reduction + written timeline

Must-have

Faulty kitchen socket earthing

Electrician certification before move-in. Non-negotiable for safety.

Recommended

Slow bathroom 2 drainage

Plumber visit before move-in. ₹500-800 cost to them, major inconvenience to you.

Recommended

Hairline cracks — document in lease

Add clause: cracks noted at move-in, not tenant liability at move-out.

Reviewed by: Senior Inspector, Suresh K.

This report reflects observations at the time of inspection. Parakh operates independently. We have no financial relationship with the landlord, seller, or any broker involved in this property.

Your property. Your report.

Book an inspection and get this level of detail on the property you're about to commit to.